Thursday, November 09, 2006
VLE Owners Newsletter 11/09/06: Railings
Some of the railings in the resort are being refinished. This includes, as far as I can tell, those on the seawall along the beach and those along the edges of the terraces in Phase I. The railings are being removed and taken away for (I think it’s called) electrostatic painting, then reinstalled. They have a nice, new finish with subtle copper-colored flecks. It’s been fun watching them hoisted by rope up and down the sides of Phase I.